Client: Mosman Council
The works involved the seawall restoration, augmentation and ecological engineering works at three sites within the Mosman council precinct.
Pearl Bay involved 800m of seawall restoration and augmentation with rock toe protection, semi aquatic planting, increased foreshore access with new steps and beautification works including a foreshore footpath and planting.
Spit East Beach involved the building of a sandstone block seawall to protect foreshore erosion from storm events.
Parriwi Point involved structural works on a badly eroded seawall.