The work required the demolition of existing footpaths and reinstatement with new paved walk way. New kerbs were instated as well as residential stormwater connections, new garden beds, new kerb ramps and street lighting.
The work required the demolition of existing footpaths and reinstatement with new paved walk way. New kerbs were instated as well as residential stormwater connections, new garden beds, new kerb ramps and street lighting.